Regional Training Program - Session 1 - Portland Cement Mortar Beds
View Registrations Tell a Friend About This EventTell a Friend
Regional Training Program - Session 1 - Portland Cement Mortar Beds

10/5/2017
When: Thursday, October 5, 2017
7:30 AM
Where: Bricklayers and Allied Craft Workers Training Center
17125 W. Cleveland Avenue
New Berlin, Wisconsin  53227
United States
Contact: Becky Serbin
770-366-2566


Online registration is closed.
« Go to Upcoming Event List  

 



This course if for session #1 only.
Portland Cement Mortar Setting Beds

Only 20 spots available! Register Now!

$50.00 Refundable deposit

All no shows/cancellations forfeit a refund.

 

 
  • 7:30 - 8:00 Arrive at Training Center:
    17125 W Cleveland Ave New Berlin, WI
    Sign in
    Continental Breakfast

  • 8:00 Welcome and Introductions
    Overview of Program and Session Curriculum
    Safety Briefing

  • 8:15 Presentation
    Introduction to Tile Industry Standards
    Substrate Analysis and Preparation

  • 9:30 Break into registered session #1  
    #1 Portland Cement Mortar Setting Beds

  • 11:45 Lunch / Vendor Tabletops

  • 12:45 Return to registered session #1
    Portland Cement Mortar Setting Beds

  • 4:30 Session Review Q &A

Detailed Description


9:45 Thick bed mortar systems: Lead instructor provides group with an
introduction to the benefits of using a thick bed system as the substrate for a
tile installation.

10:00 Mini Session: Qualifying the Installation and Surface Preparation.
• Flat, plumb, level, square.
• Advantages of a thick mortar bed for floors and showers.

10:45 Mini Session: Thick Bed Mortar / Mud
• ANSI A108.01 and ANSI A108.1A / .1B / .1C
• Site mixes: Portland cement, sand, hydrated lime and various mix ratios
• Bag mixes: Introduction to bag mixes and reasons for using

11:00 Tour of displays and mockups

11:15 Hands on Session: Job site prep for floors. Break into small groups.
Instructors guide attendees to examine the substrate.
• Measuring and estimating quantities
• Minimum and maximum thickness
• Finding perimeter height, installing a perimeter movement joint, setting
screeds or points, proper reinforcement material.
  11:45 Lunch and Vendor Tabletops, Q&A

12:45 Hands on Session: Site mix dry pack mud for floors (small groups)
• Mixing mud. Finding level / flat on perimeter. Setting screeds. Packing
mud. Minimum and maximum thickness. (TCNA F111 / F112)

2:15 Hands on Session: Bag mix dry pack mud for showers (small groups)
• Pre-slope / pitch requirements and methods (TCNA B415 / B421 / B422)
• Differences and advantages of a pre-slope or topical membrane
• Drain types, liners, membranes, curbs, walls

3:30 Wall flatness demonstration (full group)
• Lead instructor will explain proper vertical substrate preparation for
mortar bed on a vertical interior substrate. (TCNA W221 / W222)
• Master craftsman demonstration of installation of mortar bed on a
vertical substrate. (TCNA W221 / W222)

4:30 Review
Q&A